Wic-Dry Pad Installation

WIC-DRY PAD INSTALLATION

Open Stand. Remove used pad by pulling away from velcro from top seam downwards
Lay new pad flat onto floor with all four corners showing
Center unit head evenly left, right, front & back onto pad
Tilt unit down towards floor so that pad attaches to one side of velcro on T Bar
Lift unit up and with other hand, squeeze pad firmly against sides and top of velcro
Once attached make sure pad covers the entire left and right side of T Bar
 
 

IMPORTANT: IMPROPER INSTALLATION OF WIC-DRY PAD WILL REDUCE PERFORMANCE. PLEASE MAKE SURE IT IS INSTALLED EVENLY LEFT TO RIGHT AND FIRMLY PRESSED AGAINST SIDES AND TOP VELCRO